I know some of you will have seen this before, but I thought I’d post it here before it gets lost when I pull the JA site.
It’s been almost a year now since I installed my JKS Disconnects and I never got around to installing the pegs to secure the anti-roll bar in the up out of the way position. I never really fancied drilling the chassis! I did the same as most people and used cable-ties!
Whilst installing my winch a few weeks back, I had to remove the plastic trim which covers the anti-roll bar and I realised I could use these existing holes to fix a bracket to and then mount the JKS pegs.
I already had some steel left over after the CB installation and it did the job just fine. I had to purchase 2 M8 x 40 mm cap screws instead of using the imperial ones supplied with the disconnects. I had to cut about 5mm off them!
The brackets needed a small dogleg bending into each of them to allow room for the nut. And as usual, the brackets were well painted and waxoyled before installation.
These photos tell the rest of the story.